Kitchener Barracks
Description
O’Keefe has carried out the second phase of groundworks and infrastructure works for a new residential development by modular off-site specialist TopHat. Located on the site of the historic Kitchener Barracks in Kent, the project is part of a larger scheme that will deliver almost 300 new homes over three phases on the 4.8-acre site. The company was also principal contractor on the first phase of the scheme, completed in early 2021. The site knowledge gained by the team on that phase has assisted greatly when dealing with the construction element of the phase two works.
The Kitchener Barracks project involved the construction of three four-storey blocks of modular apartments which comprised 96 one- and two-bedroom homes. The apartments were precision-engineered at TopHat’ s factory in Derbyshire and delivered to site ready for installation. In this phase, some 240 modular sections were assembled on site and cassette corridor sections were then installed at the upper levels between the rows of apartments.
O’Keefe’s role included part-construction of foundations, drainage and services for the modular apartments, plus access roads and external finishings. Although the apartment modules were manufactured off-site, they still required foundations and services to be built in-situ.
The foundations were mass concrete strip footings bedded a minimum 200mm into the underlying chalk strata. One of the biggest challenges for O’Keefe was to ensure the on-site works perfectly align with the factory-built modules. Working to exacting tolerances, O’Keefe formed upstands to receive the prefabricated modular units.
O’Keefe formed the drainage connections prior to the modular sections being installed. Service entries were taken into the plantrooms situated in the two stair cores and then distributed to the modular units. Reinforced concrete upstands and slabs were constructed within the two cores and the end escape stairs and a reinforced concrete in-situ lift core constructed to each of the cores, with a steel framework installed prior to installation of the modules.
O’Keefe’s contract also involved construction of a reinforced concrete (RC) frame extension off the back of the existing Khartoum Building, dating from the 1930s. The RC frame comprises a lower ground floor/basement level for parking, including electrical vehicle charging bays, with a ground level transfer slab above. This forms part extension for housing apartments and part outdoor terrace. A particular challenge here was the interface between the existing Khartoum Building and the new RC frame.
The complex design was a continuous, coordinated process assisted by O’Keefe, the consultant engineers, architects and TopHat, to ensure that further survey work was carried out to slabs, roofs, cavities and foundations for the structural frame to have its final design.
Andrew Shepherd, managing director of TopHat Solutions said: “TopHat have worked closely with O’Keefe on this complex and ground breaking project. It was essential that we had a partner that was able to address a number of different challenges from foundations for an innovative modular project through to a concrete frame that would tie into an existing heritage building. This ongoing relationship has been formed on a process of innovation and continuous improvement, which underpins our joint approach to future projects.”
Details
- Contract: Kitchener Barracks
- Client: Tophat
- Location: Kent
- Value: £13m
- Duration: 108 Weeks
- Scope: Modular, Groundworks And Infrastructure